Concrete Calculator

Concrete Calculator. Enter your project's length, width, and thickness to calculate exactly how much concrete you need. Choose your shape type — slab, footing, or column — and the tool returns cubic yards, cubic feet, and the number of pre-mix bags (40 lb, 60 lb, and 80 lb) required. You can also add a quantity for multiple identical sections and see a cost estimate if you enter a price per cubic yard. Also try the calculate Concrete Block.

Concrete Calculator inputs

Select the shape that best matches your project.

ft

Length of the slab or footing in feet.

ft

Width of the slab or footing in feet.

in

Standard residential slab thickness is 4 inches.

in

Outer diameter for round columns or circular slabs (in inches).

in

Height or depth for round column/footing in inches.

Enter how many identical slabs, columns, or footings you need.

$/yd³

Enter the cost of ready-mix concrete per cubic yard to estimate total cost.

Results

Volume (Cubic Yards)

--

Volume (Cubic Feet)

--

40 lb Bags Needed

--

60 lb Bags Needed

--

80 lb Bags Needed

--

Estimated Concrete Cost

--

Use this slab concrete calculator to turn three measurements into the cubic yards of concrete you need to order, plus an estimate in bags and dollars. Whether you are one of the homeowners planning a DIY patio or a contractor checking a quote, you enter length, width and thickness, add a waste factor, and read the result in seconds. The sections below show the math, so you can verify every number yourself.

How to Use This Concrete Calculator

The tool needs only your project dimensions, a waste percentage and, if you want a cost, your local ready-mix price. Work through the three steps below and the result updates for slabs, footings and columns.

Enter Project Dimensions and Slab Thickness

Measure length and width in feet, then enter the thickness in inches. The tool will convert inches to feet for you and apply length × width × thickness automatically. A walkway or patio slab commonly runs 4 inches, while heavier-duty work runs thicker.

Read Cubic Yards and Cubic Feet

The result panel shows cubic yards first, because suppliers sell by the yard, then cubic feet for the bag math. One cubic yard equals 27 cu ft, so the two readings always agree. Compare the figure with the concrete needed for your slab before you place an order.

Pick Your Bag Size in the Concrete Calculator

Choose between 40 lb bags, 60 lb bags and 80 lb bags. The tool divides your slab volume by each bag's yield and will round up to whole bags. Premix bags from different brands list their own numbers, so the right bag size is whichever label you are actually buying.

Slab Calculator Formula: Divide by 27

Every shape reduces to one idea: find the volume in cubic feet, then divide by 27 to reach yards.

$$\text{Cubic yards} = \frac{\text{Length (ft)} \times \text{Width (ft)} \times \text{Thickness (ft)}}{27}$$

Concrete Slab Calculator Math for Rectangles

For a rectangle, multiply the three dimensions of the slab in feet and apply the formula above. Patios, sidewalks and garage floors all work this way. Rebar, wire reinforcement and the foundation beneath a slab do not change the concrete volume, but a thickened edge does. Always round up your final estimate so you never end up short.

Round Concrete Shapes: Columns and Post Holes

Circular forms use the cylinder volume, \(V = \pi r^{2} h\). A 16 in wide, 4 ft deep hole has a radius of 0.667 ft, giving 5.59 cu ft, or 0.207 cu yd. Columns follow the same rule; multiply by the number of identical posts. A bag's stated yield already reflects mix density, so you add nothing for it.

Worked Example: Concrete Needed for a 14 × 9 Patio

Take a 14 ft × 9 ft patio slab poured 5 inches thick with a 10% waste factor. Concrete calculators repeat the same steps every time:

StepCalculationResult
Thickness in feet5 ÷ 120.417 ft
Slab quantity (cu ft)14 × 9 × 0.416752.5 cu ft
Cubic yards52.5 ÷ 271.944 cu yd
Add 10% waste1.944 × 1.102.139 cu yd (57.75 cu ft)
80 lb bags57.75 ÷ 0.697 bags
60 lb bags57.75 ÷ 0.45129 bags
Ready-mix cost at $152 a cubic yard2.139 × 152$325

A supplier delivering in quarter-yard steps makes your order quantity 2.25 cubic yards, or about $342.

Driveway and Footing Variations

A 24 ft × 12 ft driveway at 6 inches needs 144 cubic feet, or 5.33 cubic yards before waste. Driveways usually run thicker and often carry rebar. A 32 ft footing run, 16 inches wide and 10 inches deep, holds 35.56 cubic feet, about 1.32 cubic yards before waste.

Concrete Needed for a Shed Pad: A Concrete Slab Calculator Walkthrough

I'm pricing an 11 ft × 8.5 ft shed pad at 4 inches thick, and the real question is truck or bags. Into the calculator go 11, 8.5 and 4, plus a 5% waste factor, because my forms are square and the subgrade is tamped flat.

The steps: 4 ÷ 12 = 0.333 ft, then 11 × 8.5 × 0.3333 = 31.17 cu ft, or 1.154 cubic yards. With waste that is 1.212 cubic yards (32.73 cu ft). My hand check, 1.212 × 45, gives 54.5 bags of 80 lb, and the tool says 55. The manufacturer specifications on the bag label list 0.6 cu ft of yield, so the two methods agree.

Now the decision. A concrete bag calculator would stop at 55 bags, about $374 at $6.80 each. Ready-mix at $168 a yard, ordered as 1.25 yards, is $210, plus a $95 delivery fee for the small load, so $305 in total. The truck wins by about $69 and saves a day of hand mixing.

ThicknessVolume with 5% waste80 lb bagsTruck minus bags
4 in1.212 cu yd55$69 cheaper
5 in1.515 cu yd69$80 cheaper

The number to watch is thickness: each extra inch adds about 0.29 cubic yards here, so a 5 inch pad means 69 bags and a 1.75 yard order quantity. I'd also distrust this answer on uneven ground. If one corner sits a full inch low, the extra concrete matches the sensitivity row above, so I would use 10% waste instead and ask the plant to confirm its quarter-yard increments before I round up.

How Many Bags of Concrete Do You Need?

Count the bags of concrete by dividing the volume in cubic feet by the bag's yield:

$$\text{Bags} = \frac{\text{cubic feet}}{\text{yield per bag}}$$

Yield per Bag for Small Pours

Manufacturer specifications put an 80 lb bag at 0.6 cubic feet, a 60 lb bag at 0.45 and a 40 lb bag at 0.3, so 45, 60 and 90 bags fill one yard. Bag mixing suits shed bases and a short run of walkways under about a yard. Past that, hand mixing becomes a full day's work in one pour, and the mix quality drifts as you tire.

Concrete Bag Calculator Costs: Ready-Mix vs Bags

Compare ready-mix and bags on the delivered price, not the sticker. Ready-mix concrete arrives by truck, so one visit covers the whole volume, and it is usually cheaper per yard on larger orders. Bagged mix wins on small jobs where a truck would barely be worth the trip, and half a cubic yard is usually the tipping point.

Multiply the volume by your local concrete price and you have the material cost. That figure uses the cost per cubic yard you enter, so check it with two suppliers before you rely on the estimate. Compare it with the bag total from the previous section before choosing.

Short-Load Fee and Concrete Delivery Charges

Many plants add a short-load fee when an order falls under their minimum load, plus a delivery fee that varies by distance. Neither appears in the volume math, so ask your supplier for both and add them to your estimate. A contractor can usually quote them in one call, and even a small slab under one cubic yard may be cheaper in bags.

What Concrete Calculators Assume About Waste

Spillage, uneven forms and over-excavation all use more concrete than the geometry predicts. Most tools add a waste factor of 5% for tidy formed work and 10% when conditions are rougher, and the result already includes that waste.

Waste Allowance for Rough Subgrade

Set the waste allowance higher on a rough subgrade, because soft spots swallow extra concrete before the surface levels out. Uneven ground is the usual culprit. Running short halfway through is the costly mistake: the delay can leave a cold joint in the slab, and construction crews rarely forgive one.

Thickness and Local Building Codes

Your slab thickness changes volume faster than length or width, because every extra inch adds to the whole area. Check local building codes before you finalize it; a structural slab may also need more strength than a patio does.